At BEML’s Bengaluru plant, Ashwini Vaishnaw inspected key manufacturing stages and quality tests for India’s bullet train. The 202-metre, eight-coach train is designed to operate at 249 kmph. It is also planned to use the indigenous Bharat Train Control System.
At BEML’s Bengaluru plant, Ashwini Vaishnaw inspected key manufacturing stages and quality tests for India’s bullet train. The 202-metre, eight-coach train is designed to operate at 249 kmph. It is also planned to use the indigenous Bharat Train Control System. by Soban News (international And National News)