The metals major is adding 3.6 lakh tonnes a year of primary aluminium capacity at the site, alongside commissioning a 1.7 lakh tonnes a year flat rolled products (FRP) mill
The metals major is adding 3.6 lakh tonnes a year of primary aluminium capacity at the site, alongside commissioning a 1.7 lakh tonnes a year flat rolled products (FRP) mill by Soban News (international And National News)